Given the Total remaining estimate in an epic, provide a Predicted Due Date.
A valid configuration for this Calculated Date-Time Field:
The display format is configured as shown:
addTimeSkippingWeekends({00057}, {10200}*{DAY}, LOCAL, {FRIDAY}, {SATURDAY})
Note that:
Once configured and added to an issue screen (e.g. an epic), the result will look like this: