The following situation:
Two issue type: Test and Story
Two link type: Pruebas (Es probado por, Esta probando a) and Pruebas Old (Fue probado por, Probó a)
Pruebas Link type between Test and Story. "Es probado por" from Story and "Esta probando a" from Test.
I need change Pruebas link to Pruebas Old. For example:
Post-function Create issue link with the following configuration:
Post-function Break issue link with the following configuration:
Once configured, the transition in Test's workflow will look like this:
The following situation:
Two issue type: Test and Story
Two link type: Pruebas (Es probado por, Esta probando a) and Pruebas Old (Fue probado por, Probó a)
Pruebas Link type between Test and Story. "Es probado por" from Story and "Esta probando a" from Test.
I need change Pruebas link to Pruebas Old. For example:
Post-function Create issue link with the following configuration:
Post-function Break issue link with the following configuration:
Once configured, the transition in Test's workflow will look like this: