You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 29 Next »

Rules are basically checks, that can be combined and bundled in Reports. Once a report is run against a timesheet, all rules will be executed against the selected timesheet. 

Timesheet Check comes with basic metrics like the length of working days or daily rest periods to get started right away. Based on these metrics, rules are set up in minutes to meet any regulations or policies.


A rule, apart from a name and an optional description, consists of three key elements - a metric, an operator, and a value.

The metrics are built-in, whereas the operators and values can be customized by the users. 

You must have the relevant permissions to configure rules.


Metrics

The metric is the 🧡 of a rule and can be seen as a framework, or a built-in check that defines what you can configure inside of a rule.

Working day

The working day metric lets you define the minimum or maximum length of a regular working day.

It accumulates the total of all time logged on any given day.


Example configuration

One of the 🔥 Preset rules 🔥uses the working day metric to ensure that users do not log more than 10 hours on any given working day.

Translation

The total of work logged on any given day must be lower than or equal to (<=) 10 hours and 0 minutes for the check to pass (tick).

Rest breaks

The rest breaks metric lets you define the total duration of the rest break(s) needed on a given working day.

It accumulates the total duration between workload entries on any given day.

According to some regulations a break must have a minimum duration to be counted as such. The duration can be configured in the global Settings.

Example configuration

One of the 🔥 Preset rules 🔥 uses the rest break metric to ensure that users have a minimum of 30 minutes of rest breaks when their working day exceeds 6 hours. 


Translation

The total time between worklogs must be greater than or equal to (>=) 0 hours and 30 minutes if a user has logged more than 6 hours on any given working day for the check to pass (tick).

Daily rest period

The daily rest period metric lets you define the minimum length of a daily rest period

It measures the interval between the End time of the last worklog of any given day and the Start time of the first workload of the next working day.



Example configuration

One of the 🔥 Preset rules 🔥 uses the daily rest period to ensure that users have rested for a minimum of 11 consecutive hours between two work logs on a given working day.


Average of work logged


The average of work logged metric lets you define the minimum or maximum average working time of a user.

It calculates the average daily working time (total of time logged on any a day) over a given Tempo period. The Tempo period will be selected once you execute this rule in Reports.


Example configuration

One of the 🔥 Preset rules 🔥 uses the average of work logged metric to ensure that the average daily working time does not exceed 8.5 hours

Translation

The total of work logged on any given day must be lower than or equal to (<=) 8 hours and 30 minutes on average in a given Tempo period for the check to pass (tick).


Create your first rule

Jona Ittermann Screencast?

Navigate to the Rules page in the Timesheet Check administration.

Need inspiration? Timesheet Check comes with some preset rules. Since they can be modified by anyone with adequate permissions we have listed them for you here: 🔥 Preset rules 🔥

Click on + New rule

Select a metric.

Select a name and optionally a description.

Rule descriptions will help you to identify the rule you are looking for in the future.

Configure the rule by selecting an operator and time definitions.

Submit your configuration.

  • No labels