Every content item in this list is tagged with all the required labels:
To add a label to the list of required labels, choose '+ labelname' from Related Labels.
To remove a label from the required labels, choose '- labelname' from above.
-
Transition linked issues in currently active sprint (Jira Workflow Toolbox (Server / DC) 2.x)
-
Set priority for issues that have been in a certain status for longer than 24 hours (Jira Workflow Toolbox (Server / DC) 2.x)
-
Create a sub-task for each user selected in a Multi-User Picker (Jira Workflow Toolbox (Server / DC) 2.x)
-
Create a story for each component in an epic (Jira Workflow Toolbox (Server / DC) 2.x)
-
Create 3 issues in 3 different projects (Jira Workflow Toolbox (Server / DC) 2.x)
-
Create specific sub-tasks for each selected component (Jira Workflow Toolbox (Server / DC) 2.x)
-
Assign new issues to a different project role depending on field value in current issue (Jira Workflow Toolbox (Server / DC) 2.x)
-
Create a sub-task in each story of an epic (Jira Workflow Toolbox (Server / DC) 2.x)
-
-
Automatically close resolved sub-tasks when parent issue is closed (Jira Workflow Toolbox (Server / DC) 2.x)